Remonument Control (1)
Survey Control (2)
| Control Point |
| Property Iron |
Benchmark (3)
DFIRM Panel - 2009 (5)
Cross Section (6)
DFIRM Flood Hazard Area (7)
| X (500 Year) |
| A (100 Year) |
| AE (100 Year with Eng Study) |
| AE (100 year with Eng Within Floodway) |
Site Plan Mylars (8)
| As-Built |
| Field Sketch |
| Proposed |
| Unknown |
| Unknown |
Sidewalk Waiver (9)
Capital Improvement Projects (10)
| ASPH PARTIAL MILL SINGLE OVER |
| ASPH RECONSTRUCTION |
| ASPH SINGLE SURFACE OVERLAY |
| CAPITAL IMPROVEMENT |
| CONCRETE RECONSTRUCTION |
| CONCRETE SLAB REPLACEMENT |
| OTHER |
Contour 2ft >4800 (12)
Contour 2ft <4800 (13)
| 0 |
| 1 |
LOMA (14)
| N |
| Y |
Wetlands (15)
Watershed (16)
| CLINTON |
| ROUGE |
Engineering Plots (17)
Environmental Reports (18)
Sidewalk Permits (19)
Driveway Approach Waivers (20)
Easements (21)
Road Soft - Pavement PMS Model (22)
Capital Improvement (23)
| Local Road |
| Major Road |
| Sewer |
| Storm |
| Water |
|